Stakeholder Identification and the Performance of CIKAPS in Busia County
DOI:
https://doi.org/10.55077/edithcowanjournalofentrepreneurshipandprojectmanagement.v9i1.134Keywords:
Stakeholder identification, Internal Stakeholder External Stakeholder Stakeholder interests project performanceAbstract
Purpose: The study aimed to investigate the impact of stakeholder management on the performance of CIKAPs in Busia County, Kenya.
Methodology: It employed a descriptive research design and focused on 52 CIKAPs staff members within the county. A comprehensive survey was conducted, encompassing all 52 staff members, using questionnaires as the primary data collection tool. Data was coded by assigning numerical values to responses and analyzed using SPSS version 26.0. The research utilized both descriptive and inferential statistics to process the data, employing descriptive measures like means, variances, frequencies, standard deviation, and median, among others, to provide a summary of the dataset. Qualitative data was subjected to content analysis. Quantitative results were presented using charts, statistics, graphs, and diagrams, while content analysis findings were conveyed through narratives.
Results: The study indicated that stakeholder identification is positively and significantly linked to project performance (β = 0.318, p = 0.023).
Unique contribution to theory, policy and practice: There is need to conduct a comprehensive stakeholder analysis to identify all relevant stakeholders involved in the projects. This should include individuals, organizations, and community groups that have an interest or influence in the project outcomes. The study also recommends the CIKAPs to use a combination of qualitative and quantitative methods, such as surveys, interviews, and focus groups, to gather information about stakeholders' needs, expectations, and concerns. The study also recommends the CIKAPs to regularly review and update the stakeholder identification process to account for any changes or new stakeholders that may emerge over time.
References
Alkilani, S., & Loosemore, M. (2022). An investigation of how stakeholders influence construction project performance: a small and medium sized contractor’s perspective in the Jordanian construction industry. Engineering, Construction and Architectural Management, (ahead-of-print).
Alqaisi, I. F. (2018). The effects of stakeholder engagement and communication management on projects success. In MATEC Web of Conferences, 162(02037). EDP Sciences.
Assaad, R., El-Adaway, I. H., & Abotaleb, I. S. (2020). Predicting project performance in the construction industry. Journal of Construction Engineering and Management, 146(5), 1 - 22. doi.org/10.1061/(ASCE)CO.1943-7862.0001797
Baharuddin, H. E. A., Ismail, N. A. A., Adnan, H., Ismail, W. N. W., & Piri, I. (2022, October). Cross case analysis on internal early preparation of stakeholder engagement for infrastructure projects. In IOP Conference Series: Earth and Environmental Science (Vol. 1067, No. 1, p. 012072). IOP Publishing.
Barthol, S. (2022). Stakeholder Orientation as a Predictor of Project Success. AMCIS 2022 TREOs. 11. https://aisel.aisnet.org/treos_amcis2022/11
Beldinne, W. J., & Gachengo, L. (2022). Stakeholders’ Resource Management and Performance of Road Construction Projects in Siaya County, Kenya. Journal of Entrepreneurship & Project Management, 2(1), 1-10.
Bera, A. K., & Jarque, C. M. (1981). Efficient tests for normality, homoscedasticity and serial independence of regression residuals: Monte Carlo evidence. Economics Letters, 7(4), 313-318.
Bergfeld, A., Plagmann, C., & Lutz, E. (2021). Know your counterparts: The importance of wording for stakeholder communication in social franchise enterprises. VOLUNTAS: International Journal of Voluntary and Nonprofit Organizations, 32(1), 104-119.
Bigbee, J. A. S., & Stevenson, D. H. (2019). IT Project Communication: An Investigation of Its Dimensions and Relationship to Project Success. International Journal of Information Technology Project Management (IJITPM), 10(3), 56-72.
Borgobello, A., Pierella, M. P., & Pozzo, M. I. (2019). Using questionnaires in research on universities: analysis of experiences from a situated perspective. REIRE Revista d'Innovació i Recerca en Educació, 12(2), 1-16.
Chepchirchir, G., & Nyang’au, S. (2022). Stakeholder’s Involvement Practices and Performance Of Street Children Rehabilitation Projects In Nairobi City County. International Journal of Social Sciences Management and Entrepreneurship (IJSSME), 6(2).
Cook, K. S., Cheshire, C., Rice, E. R., & Nakagawa, S. (2013). Social exchange theory. Handbook of social psychology, 61-88.
Cosmus, K. M. (2021). Stakeholder Involvement and Infrastructure Projects Implementation in Kenya Ports Authority.
Cover, R. (2015). Digital identities: Creating and communicating the online self. Academic Press.
Cronbach, L. J., & Meehl, P. E. (1955). Construct validity in psychological tests. Psychological Bulletin, 52(4), 281.
Cropanzano, R., & Mitchell, M. S. (2005). Social exchange theory: An interdisciplinary review. Journal of Management, 31(6), 874-900.
Cruz Villazón, C., Sastoque Pinilla, L., Otegi Olaso, J. R., Toledo Gandarias, N., & López de Lacalle, N. (2020). Identification of key performance indicators in project-based organisations through the lean-approach. Sustainability, 12(15), 5977.
Danbaba, G., Nabegu, A. B., Binta, A., & Mustapha, A. (2016). Assessment of implementation of the environmental sanitation policy in the federal capital territory (FCT) Abuja, Nigeria. Global Journal of Social Sciences Studies, 2(1), 1-13.
Dannels, S. A. (2018). Research design. In The reviewer’s guide to quantitative methods in the social sciences (pp. 402-416). Routledge.
de Araújo Lima, P. F., Marcelino-Sadaba, S., & Verbano, C. (2021). Successful implementation of project risk management in small and medium enterprises: a cross-case analysis. International Journal of Managing Projects in Business.
de Vet, H. C., Mokkink, L. B., Mosmuller, D. G., & Terwee, C. B. (2017). Spearman-Brown prophecy formula and Cronbach's alpha: different faces of reliability and opportunities for new applications. Journal of Clinical Epidemiology, 85, 45-49.
DeCotiis, T. A., & Dyer, L. (1979). Defining and measuring project performance. Research Management, 22(1), 17-22.
Di Maddaloni, F., & Davis, K. (2018). Project manager's perception of the local communities' stakeholders in megaprojects. An empirical investigation in the UK. International Journal of Project Management, 36(3), 542-565.
Erkul, M., Yitmen, I., & Çelik, T. (2016). Stakeholder engagement in mega transport infrastructure projects. Procedia Engineering, 161, 704-710. https://doi.org/10.1016/j.proeng.2016.08.745
Eskerod, P., Huemann, M., & Savage, G. (2015). Project stakeholder management—Past and present. Project management journal, 46(6), 6-14.
Figueiredo Filho, L. B. G., de Castro Fetterman, D., & Bozon, M. The Effects of Stakeholders Management on Risks: An IT Projects Analysis.
Figueiredo Filho, L. B. G., de Castro Fettermann, D., & Bouzon, M. (2021). The Effects of Stakeholders Management on Risks: An IT Projects Analysis. Proceedings of the International Conference on Industrial Engineering and Operations Management. Sao Paulo, Brazil, 655 - 665,
François, D. B. A., & FCPA, F. (2020). Note On Literature Review. https://carleton.ca/profbrouard/wp-content/uploads/noteResearchLiteratureReview.pdf
Freeman, R. E. (1984). Strategic management: a stakeholder approach, Pitman. Boston, MA.
Freeman, R. E., & Reed, D. L. (1983). Stockholders and stakeholders: A new perspective on corporate governance. California management review, 25(3), 88-106.
Freeman, R. E., Harrison, J. S., & Zyglidopoulos, S. (2018). Stakeholder theory: Concepts and strategies. Cambridge University Press.
Freeman, R. E., Wicks, A. C., & Parmar, B. (2004). Stakeholder theory and “the corporate objective revisited”. Organization Science, 15(3), 364-369.
Garnham, N. (1995). Political Economy and Cultural Studies: Reconciliation or Divorce? Critical studies in mass communication, 12(1), 62-71.
Gitau, O., & Sang, P. (2022). Sustainable project risk and stakeholder management for pension funds projects performance in Kenya. International Journal of Research in Business and Social Science (2147-4478), 11(1), 273-282.
Gogtay, N. J., & Thatte, U. M. (2017). Principles of correlation analysis. Journal of the Association of Physicians of India, 65(3), 78-81.
Guo, X., & Kapucu, N. (2019). Examining stakeholder participation in social stability risk assessment for megaprojects using network analysis. International Journal of Disaster Risk Management, 1(1), 1-31.
Gupta, S. K., Gunasekaran, A., Antony, J., Gupta, S., Bag, S., & Roubaud, D. (2019). Systematic literature review of project failures: Current trends and scope for future research. Computers & Industrial Engineering, 127(2019), 274-285. https://doi.org/10.1016/j.cie.2018.12.002
Hackman, J. R., & Oldham, G. R. (1976). Motivation through the design of work: Test of a theory. Organizational behaviour and human performance, 16(2), 250-279.
Hadi, N. U., Abdullah, N., & Sentosa, I. (2016). An easy approach to exploratory factor analysis: A marketing perspective. Journal of Educational and Social Research, 6(1), 215-215.
Hagqvist, E., Vinberg, S., J. Landstad, B. & Nordenmark, M. (2018). Is the gap between experienced working conditions and the perceived importance of these conditions related to subjective health?” International Journal of Workplace Health Management, 11(1), 2- 15. https://doi.org/10.1108/IJWHM-08-2017-0067
Hanusz, Z., & Tarasińska, J. (2015). Normalization of the Kolmogorov–Smirnov and Shapiro–Wilk tests of normality. Biometrical Letters, 52(2), 85-93.
Hassan, S. D., Njoroge, K., & Kimemia, F. (2021). Influence Of Regular Promotion on Health Care Workers Retention in Public Health Facilities In Garissa County, Kenya. Academic Journal of Health Systems and Reform. 123 – 140.
Homans, G. C. (1958). Social behaviour as exchange. American journal of sociology, 63(6), 597-606.
Huemann, M., Eskerod, P., & Ringhofer, C. (2016). Rethink! project stakeholder management. Project Management Institute, Incorporated. https://www.projectmanagement.com/pdf/Rethink_Project_Stakeholder_Management.pdf
Hutcheson, G. D., & Sofroniou, N. (1999). The multivariate social scientist: Introductory statistics using generalized linear models. Sage.
Ikart, E. M. (2019). Survey questionnaire survey pretesting method: An evaluation of survey questionnaire via expert reviews technique. Asian Journal of Social Science Studies, 4(2), 1.
Inkpen, A. C., & Sundaram, A. K. (2021). The Endurance of Shareholder Value Maximization as the Preferred Corporate Objective. Journal of Management Studies.
Institute, P. M. (2013, January). A Guide to the Project Management Body of Knowledge: PMBOK (R) Guide. Project Management Institute. http://faspa.ir/wp-content/uploads/2017/09/PMBOK6-2017.pdf
Iriarte, C., & Bayona, S. (2020). IT projects success factors: a literature review. International Journal of Information Systems and Project Management, 8(2), 49-78.
Jones, T. M., Wicks, A. C., & Freeman, R. E. (2017). Stakeholder theory: The state of the art. The Blackwell guide to business ethics, 17-37.
Josserand, E. (2019). From Literature Review to Research Problem. In Chevalier, F., Cloutier, L.M., Mitev, N. (Eds). Research Methods for the DBA, collection Business Science Institute, Paris: EMS éditions management & société, 564p. p.65-80.
Kaiser, H. F. (1974). An index of factorial simplicity. Psychometrika, 39(1), 31-36.
Kennedy, A. R. (2022). Does It Pay to Pay for Success? Stakeholder Perceptions of Costs and Benefits of PFS Feasibility Studies. Public Performance & Management Review, 45(5), 1088-1111.
Kimanzi, A. (2022). Stakeholder Involvement and Implementation of Projects by Kitui County Government, Kenya. Journal of Entrepreneurship & Project Management, 2(5), 1-9.
Kivunja, C. (2018). Distinguishing between theory, theoretical framework, and conceptual framework: A systematic review of lessons from the field. International Journal of Higher Education, 7(6), 44-53.
Klaus-Rosińska, A., & Iwko, J. (2021). Stakeholder Management—One of the Clues of Sustainable Project Management—As an Underestimated Factor of Project Success in Small Construction Companies. Sustainability, 13(17), 9877.
Kuckertz, A., & Brändle, L. (2021). Creative reconstruction: a structured literature review of the early empirical research on the COVID-19 crisis and entrepreneurship. Management Review Quarterly. 1(2021), 1-27. https://doi.org/10.1007/s11301-021-00221-0
Kujala, J., Sachs, S., Leinonen, H., Heikkinen, A., & Laude, D. (2022). Stakeholder engagement: Past, present, and future. Business & Society, 61(5), 1136-1196.
Lambrou, P., Kontodimopoulos, N., & Niakas, D. (2010). Motivation and job satisfaction among medical and nursing staff in a Cyprus public general hospital. Human Resources for Health, 8(1), 26.
Leon, H., Osman, H., Georgy, M., & Elsaid, M. (2018). System dynamics approach for forecasting performance of construction projects. Journal of Management in Engineering, 34(1), 1 – 14. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000575
Lippmann, W. (1922). The nature of news. In W. Lippmann, Public opinion (pp. 338–357). MacMillan Co. https://doi.org/10.1037/14847-023
Lippmann, W. (1965). Public opinion. 1922. URL: http://infomotions. com/etexts/gutenberg/dirs/etext04/pbp nn10. htm.
Luoma-aho, V. (2015). Understanding Stakeholder Engagement: Faith-holders, Hateholders & Fakeholders. RJ-IPR: Research Journal of the Insitute for Public Relations, 2 (1). Retrieved from http://www.instituteforpr.org/understanding-stakeholder-engagement-fai.
Lysenko, Y., & Musa, H. (2022). The impact of various stakeholders on business performance. A literature.
Makokha, E. N. (2020). Influence Of Project Stakeholders ‘practice On Performance Of Construction Projects In Kakamega County, Kenya. International Journal of Social Sciences and Information Technology. 5(9), 23 – 32.
McCombs, M. (2005). A look at agenda-setting: Past, present and future. Journalism Studies, 6(4), 543-557.
McCombs, M. E., & Shaw, D. L. (1972). The agenda-setting function of mass media. Public opinion quarterly, 36(2), 176-187.
McCombs, M. E., & Shaw, D. L. (1972). The agenda-setting function of mass media. Public opinion quarterly, 36(2), 176-187.
McCombs, M., & Reynolds, A. (2002). News influence our pictures of the world. In Media effects (pp. 11-28). Routledge.
McGRATH, J., & Košťálová, J. (2020). Project Management Trends and New Challenges 2020+. Hradec Economic Days. Vol. 10. Part 1.
McRay, J. (Ed.). (2015). Leadership glossary: Essential terms for the 21st century. CA: Mission Bell Media.
Mohajan, H. K. (2017). Two Criteria for Good Measurements in Research: Validity and Reliability. Annals of Spiru University, 17(3), 58–82.
Mugure, G. E. (2022). Stakeholder Management And Performance Of County Government Funded Projects In Nyeri County, Kenya.
Nankoris, T., & Gakuo, M. C. (2018). Influence of Community Participation in Projects Identification and Project Design on Completion of CDF Funded Projects in Matapato South Ward, Kajiado Central Constituency, Kenya. Journal of Entrepreneurship & Project management, 2(2), 20-33.
Nemoto, T., & Beglar, D. (2014). Likert-scale questionnaires. In JALT 2013 conference proceedings (pp. 1-8). Tokyo: Jalt.
Ngwa, W. T., Adeleke, B. S., Agbaeze, E. K., Ghasi, N. C., & Imhanrenialena, B. O. (2019). Effect of reward system on employee performance among selected manufacturing firms in the Litoral region of Cameroon. Academy of Strategic Management Journal, 18(3), 1-16.
Nicolella, D. P., Torres-Ronda, L., Saylor, K. J., & Schelling, X. (2018). Validity and reliability of an accelerometer-based player tracking device. PloS one, 13(2), e0191823.
Nirel, R., & Glickman, H. (2009). Sample surveys and censuses. In Handbook of statistics (Vol. 29, pp. 539-565). Elsevier.
Njogu, E. M. (2016). Influence of stakeholder involvement on project performance: a case of NEMA automobile emission control project in Nairobi County, Kenya (Doctoral dissertation, University of Nairobi). http://erepository.uonbi.ac.ke/handle/11295/99866
Odhiambo, S. D. (2021). Project Management And Implementation Of Community-Based Projects In Siaya County, Kenya. (Unpublished Doctoral Thesis, Kenyatta University).
Oliver, T. R., & Dowell, E. B. (1994). Interest groups and health reform: lessons from California. Health Affairs, 13(2), 123-141.
Osborne, J. W., & Waters, E. (2002). Four assumptions of multiple regression that researchers should always test. Practical assessment, research, and evaluation, 8(1), 2.
Pallant, J. (2013). SPSS survival manual. McGraw-hill Education (UK). https://www.scirp.org/(S(lz5mqp453edsnp55rrgjct55))/reference/ReferencesPapers.aspx?ReferenceID=2050871
Park, C. G., & Lee, K. E. (2014). A linearity test statistic in a simple linear regression. Journal of the Korean Data and Information Science Society, 25(2), 305-315.
Parker, S., & Gallivan, C. (2011). Sampling versus census: A comparative analysis. TNS Employee Insights Report.
Porter, M. E., & Kramer, M. R. (2019). Creating shared value. In Managing sustainable business. Lenssen, G.G., Smith, N.C., Eds. Springer, Dordrecht. ISBN 978-94-024-1144-7
Project Management Institute. (2017a). Success rates rise: Transforming the high cost of low performance. Accessed July 20, 2022. https://www.pmi.org/-/media/pmi/documents/public/pdf/learning/thought -leadership/pulse/pulse-of-the-profession-2017.pdf
Rajhans, K. (2018). Effective communication management: A key to stakeholder relationship management in project-based organizations. IUP Journal of Soft Skills, 12(4), 47-66.
Rajhans, K. (2018). Effective communication management: A key to stakeholder relationship management in project-based organizations. IUP Journal of Soft Skills, 12(4), 47-66.
Rashi, T., & McCombs, M. (2015). Agenda setting, religion and new media: the Chabad case study. Journal of Religion, Media and Digital Culture, 4(1), 126-145.
Razali, N. M., & Wah, Y. B. (2011). Power comparisons of Shapiro-Wilk, Kolmogorov-Smirnov, lilliefors and Anderson-darling tests. Journal of statistical modelling and analytics, 2(1), 21-33.
Redmond, M. V. (2015). Social exchange theory. English Technical Reports and White Papers. 5. http://lib.dr.iastate.edu/engl_reports/5
Rogers, E. M. (1993). The anatomy of agenda-setting research. Journal of communication, 43(2), 68-84.
Saad, A., Zahid, S. M., & Muhammad, U. B. (2020). Role of awareness in strengthening the relationship between stakeholder management and project success in the construction industry of Pakistan. International Journal of Construction Management, 1-10.
Salmerón, R., García, C. B., & García, J. (2018). Variance inflation factor and condition number in multiple linear regression. Journal of Statistical Computation and Simulation, 88(12), 2365-2384.
Schober, P., Boer, C., & Schwarte, L. A. (2018). Correlation coefficients: appropriate use and interpretation. Anesthesia & Analgesia, 126(5), 1763-1768.
Schoonenboom, J., Johnson, R. B., & Froehlich, D. E. (2018). Combining multiple purposes of mixing within a mixed methods research design. International Journal of Multiple Research Approaches, 10(1), 271-282.
Shariff, N. M., & Abidin, A. Z. (2020). Stakeholders, social responsibility and remuneration practices in the Malaysian tourism small and medium-sized enterprises. Geo Journal of Tourism and Geosites, 29(2), 684-693.
Shaukat, M. B., Latif, K. F., Sajjad, A., & Eweje, G. (2022). Revisiting the relationship between sustainable project management and project success: The moderating role of stakeholder engagement and team building. Sustainable Development, 30(1), 58-75.
Simon, M., & Goes, J. (2016). Reliability and validity in qualitative studies (Doctoral dissertation, Dissertation).
Sitopu, Y. B., Sitinjak, K. A.., & Marpaung, F. K. . (2021). The Influence of Motivation, Work Discipline, and Compensation on Employee Performance. Golden Ratio of Human Resource Management, 1(2), 72 - 83. https://doi.org/10.52970/grhrm.v1i2.79
Sundaram, A. K., & Inkpen, A. C. (2004). Stakeholder theory and “The corporate objective revisited”: A reply. Organization Science, 15(3), 370-371.
Taherdoost, H. (2019). What is the best response scale for a survey and questionnaire design; review of different lengths of rating scale/attitude scale/Likert scale. Hamed Taherdoost, 1-10.
Taylor, R. (1990). Interpretation of the correlation coefficient: a basic review. Journal of diagnostic medical sonography, 6(1), 35-39.
Tebebu, B. (2019). Assessing internal project stakeholder communication practice: the case of Addis Ababa chamber of commerce and sectorial Association (AACCSA) projects (Doctoral dissertation, Addis Ababa University).
Thrusfield, M., & Brown, H. (2017). Surveys. In Veterinary Epidemiology: Fourth Edition (pp. 270-295). Wiley-Blackwell.
Turkulainen, V., Aaltonen, K., & Lohikoski, P. (2015). Managing project stakeholder communication: the Qstock festival case. Project Management Journal, 46(6), 74-91.
Varpio, L., Paradis, E., Uijtdehaage, S., & Young, M. (2020). The distinctions between theory, theoretical framework, and conceptual framework. Academic Medicine, 95(7), 989-994.
Venkataraman, S. (2002). Stakeholder value equilibration and the entrepreneurial process. R. E. Freeman, S. Venkataraman, eds. The Ruffin Series of the Society for Business Ethics, 3, 45-57.
von Zedtwitz, M. J. (2020). Communication and Knowledge Flow in Transnational R&D Projects. In Managing Innovation in a Global and Digital World (pp. 227-251). Springer Gabler, Wiesbaden.
Walubengo, W. W., Kyalo, D. N., & Mulwa, A. S. (2018). Community-based Projects in Kenya: analytical review of application of stakeholder analysis as a project design tool for enhancing performance. International Journal for Innovation Education and Research, 6(10), 112-123.
Wamugu, J. W., & Ogollah, K. (2017). Role of stakeholders participation on the performance of constituency development fund projects in Mathira East constituency in Kenya. International Academic Journal of Information Sciences and Project Management, 2(1), 104-125.
Wanyonyi, N. W., & Mwangi, W. S. (2016). Citizens’ Participation in development: A Case of constituency development fund in Kanduyi constituency of Bungoma County, Kenya. (Unpublished Doctoral Thesis, Kibabii University).
Weaver, D., McCombs, M., & Shaw, D. L. (2004). Agenda-setting research: Issues, attributes, and influences. Handbook of political communication research, 257.
Węgrzyn, J., & Wojewnik-Filipkowska, A. (2022). Stakeholder analysis and their attitude towards PPP success. Sustainability, 14(3), 1570. https://doi.org/10.3390/su14031570
Weston, D. P., & Lydy, M. J. (2010). Urban and agricultural sources of pyrethroid insecticides to the Sacramento-San Joaquin Delta of California. Environmental science & technology, 44(5), 1833-1840.
Yin, N. (2018). The influencing outcomes of job engagement: an interpretation from the social exchange theory. International Journal of Productivity and Performance Management.
Yu, P., Zhang, Z., & Du, J. (2016). A test of linearity in partial functional linear regression. Metrika, 79(8), 953-969.
Zikargae, M. H., Woldearegay, A. G., & Skjerdal, T. (2022). Assessing the roles of stakeholders in community projects on environmental security and livelihood of impoverished rural society: A nongovernmental organization implementation strategy in focus. Heliyon, 8(10), e10987.
Zulu, J. M., Sandøy, I. F., Moland, K. M., Musonda, P., Munsaka, E., & Blystad, A. (2019). The challenge of community engagement and informed consent in rural Zambia: an example from a pilot study. BMC medical ethics, 20(1), 1-9.
Zwikael, O., Salmona, M., Meredith, J., & Zarghami, S. A. (2022). Enhancing project stakeholder communication under insufficient knowledge of project management concepts. Engineering, Construction and Arc